Is this Ultimate Kitchens & Bathrooms still a Hawthorn contractor?
No. This domain is now an independent WWB fleet editorial guide. It is not a builder, not a showroom, and not a successor to any historic Hawthorn East licence or display home.
Not a builder, renovator, or showroom. Independent WWB fleet guide — verify licences, NCC/VBA rules, and quotes with qualified trades.

Melbourne · stone, timber, chrome
Design, waterproofing, and cost framing with the assumptions still attached — for occupied houses from Brunswick terraces to bayside villas.
At a glance
Scope
Kitchens and wet rooms in occupied Melbourne houses
First risk
Waterproofing and falls — not tap finish
Cost stance
Planning bands only, assumptions published
Not this site
No quotes, no #1 claims, no historic showroom
The brief
Three ways in

01 · Wet rooms
Same-footprint refresh versus a full gut: membranes, falls, and ventilation before anyone picks a tile.

02 · Joinery
Melbourne kitchens fail on aisle width, rangehood duct, and appliance lock — not on the mood-board island.

03 · Assumptions
Planning bands with the assumptions still attached. Not a quote, not a live price, not a guarantee.

Bathroom ledger
Melbourne bathrooms fail inspections on membranes, falls, and penetrations — not on tap finish. Read the wet-area basics, then decide shower versus bath with the room you actually own. Heritage bathroom designs sit next to a Melbourne process page, not a ranking claim.
Kitchen ledger
The working Melbourne kitchen is a services problem first: rangehood duct, dishwasher waste, oven circuits, and an aisle you can still pass when two doors open. Then it is a materials problem — see choosing benchtops and the kitchen hub.

Also on the map

04 · Risk
Why Melbourne bathrooms fail inspections on upturns and wastes, not on tap finish.

05 · Look
Contemporary, three-quarter, and stone-and-timber rooms that still fit a Victorian terrace.

06 · Where
Suburb notes on housing stock, heritage overlays, and access — editorial, not doorway copy.
Evergreen
process
Questions before you sign a reno contract
Questions that make an underquote visible before you sign a Melbourne kitchen or bathroom contract.
process
Bathroom reno timeline overview
Typical Melbourne bathroom renovation time ranges: lead times, on-site weeks, and what sits outside the program.
guides
Waterproofing mistakes that cost later
The Melbourne bathroom mistakes that show up two summers later: skipped upturns, early tiles, and unnamed systems.
FAQ
No. This domain is now an independent WWB fleet editorial guide. It is not a builder, not a showroom, and not a successor to any historic Hawthorn East licence or display home.
There is no honest fixed price. Use the planning bands on /bathroom-renovation-cost/ — they change with footprint, whether plumbing moves, and whether the membrane is a full redo. Those numbers are not quotes.
If only one room can be out of action, renovate the bathroom first when waterproofing risk is higher; renovate the kitchen first when the household cannot lose the cook line. See /guides/planning-a-reno/.
Sometimes. Same-footprint cosmetic work may not; structural changes, some wet-area rebuilds, and work affecting exits often do. Confirm the current trigger with the relevant building surveyor and the VBA — do not treat this site as a permit desk.
Internal ledger
Next step
Pair the cost-guide assumptions with the checklist, then take a written brief to a licensed trade. We do not quote, design, or install.